who much should be the lap length in reinfocement
Answers were Sorted based on User's Feedback
Answer / hassan bin mohsin
IT is 50d is for lapping lengthof bar , where d is diameter of rainforement bar
Not less then 45d lapping length
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ramesh kumar
As per the revised IS , use commonly 37D as lap
length....50D was used before...now most of the designers
following this only...
| Is This Answer Correct ? | 3 Yes | 4 No |
Answer / gopalakrishnan
column 75d to 50d
beam 50d
paving and flooring 40d and 50d
tank foundation max 75d
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / yamir betancourt
Development lengths for deformed bars in tension are
mandated by section 12.2 of the ACI code. Factors
affdecting development length are size of bar, yied stress
of bar, 28 day compressive strength of concrete, amount of
concrete cover and wether or not the bar splice is class A
or class B splice which is covered in section 12.15 of the
ACI code.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / ppl
This answer is dependent on the diameter of the bar, the
strength of the concrete, the use (type of construction),
the code you're using, and the standards in the location you
wish to build it. Find the code you need for your area and
type of construction, make sure there aren't any superseding
local standards, and then look up all the rules. Many codes
(like the international building code) have half a dozen or
more.
| Is This Answer Correct ? | 0 Yes | 3 No |
Answer / mohsin raza gardezi
Generally it is 45 d d dia of bar
50 d d dia of bar
| Is This Answer Correct ? | 0 Yes | 4 No |
Answer / aman kumar gupta
it shouldnot be less than the maximum size of aggregate or the diameter of the bar also it should not exceed 3d or 300 for main reinforcement or 5d or 450 for distribution reinforcement.
| Is This Answer Correct ? | 8 Yes | 19 No |
Should vertical shuttering done for CC/ RCC for Damp Proof Course (DPC) be measured?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
how to calculate mivan shuttering matrial
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
how to calcalate for roof beams & slab reinforcement design specified?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
0 Answers L&T, Rail Vikas Nigam Limited RVNL, RRB,
how to preaper for interview wat they asked in interview give me idea
we are use us steel in PQC road
how much quantity of bending wire required for 1sqmts
for plaster what is the suitable sand.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)