who much should be the lap length in reinfocement
Answer Posted / yamir betancourt
Development lengths for deformed bars in tension are
mandated by section 12.2 of the ACI code. Factors
affdecting development length are size of bar, yied stress
of bar, 28 day compressive strength of concrete, amount of
concrete cover and wether or not the bar splice is class A
or class B splice which is covered in section 12.15 of the
ACI code.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to do sudoko puzaals?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Mention different types of roof systems?
Explain what is alternate bid?
how to stop beam concrete between column
give me the rate analysis for Bituminous Macadam and SDBC
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
explain what do you mean by the property development.
What are the advantages of cad software?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What are the disadvantages while using stone dust as filler in pavements?
what is the price of a cubic meter of concrete on international market?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
why we create short columns under grade slab?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS