who much should be the lap length in reinfocement
Answer Posted / hassan bin mohsin
IT is 50d is for lapping lengthof bar , where d is diameter of rainforement bar
Not less then 45d lapping length
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to determine H- zone in a column? where it will occur?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Wat is meant by Aecron brick?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
How many Sft of Level Plaster per Kg
how to find quantity of concrete in PCC M15
Which Types Of Bricks ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How to calculate brick work quantity?? Block work quantity??
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
What is the name of this multiplication factors ?
it is possiblee to produce concrete with out cracks...
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.