what is the higest transmission voltage and generated
voltage in india
Answers were Sorted based on User's Feedback
765kv is transmission voltage generated voltage is 11kv
Is This Answer Correct ? | 75 Yes | 22 No |
Answer / rabi
765kv - Transmission voltage.
22KV -Generation Voltage.
Is This Answer Correct ? | 31 Yes | 11 No |
Answer / frnd4raj
Highest transmission voltage -765 KV
Highest generating voltage-21.5KV
Is This Answer Correct ? | 20 Yes | 9 No |
765 KV TRANSMISSION VOLTAGE
21 OR 22 KV AT RAMAGUNDAM (CLARIFY PLEASE)
Is This Answer Correct ? | 15 Yes | 5 No |
Answer / pankaj jha
highest ac transmission voltage- 765 KV Sipat-Seoni Line
1200 KV under testing
highest generating voltage- 21 KV
Is This Answer Correct ? | 16 Yes | 7 No |
1200 KV is under testing.
generation voltage= 11kv
Is This Answer Correct ? | 13 Yes | 8 No |
Answer / sanjeev dadhwal
Maximum Generation Voltage in India 11 KV
Maximum Transmission Voltage in India 765 KV
Significantly, India's first 1200 kV, 333 MVA Transformer has been developed, manufactured and successfully tested by BHEL.
The country is aspiring to shift to 1200 kV voltage transmission networks during the XIIth plan period.
Is This Answer Correct ? | 5 Yes | 3 No |
what will happen power cables laid without gap in underground
which frequency is to be selected for measuring earth resistivity
1 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
who invented active elements? plz give me the complte details of active elements...
What is signal flow graph?
What is the male and female contactors.where is it's used and what is the deferent betweens
what is thyristor, how is it works
Why use the VCB at High Transmission System ? Why can't use ACB? Pls explain the ans.
what is the difference between indoor & Out door substations
What is the formuala to calculate the rating of motor protection circuit breaker
reason behind why the reverse power relay of incoming machine was not acted even when no load was shifted on incoming machine after synchronising the machines ?
If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?
What are the protections to be used for Generator?