what is the permissible bend in the LT& HT CABLES.
Answers were Sorted based on User's Feedback
12D for LV cables (upto the range of 1100V) nad 15D for
high voltage cables, where D = Diameter of cables with
insulation.
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / bharat
For the cables, bending is 15 to 20D where D - Dia of the
cable.
Is This Answer Correct ? | 3 Yes | 3 No |
What is the reason that the humming sound is coming from the induction furnace panel?
We have got the HT connection of 1000 KVA in which we have installed a seprate APFC panel at the PCC end & seprate KWH meter is installed. My question is that does the KWH reading shown in the meter is a part of the Consumption ???? ( approx 500 units is shown)
it is in our knowledge tht right plug of supply of residential suppy system is phase n other is neutral...howevr the battery charger of mobile works in both ways...i mean it is not restricted in only one direction.ny of the holder of charger can hav phase .so y is it not lik tht phase of supply must b connected 2 phase of charger...?
what is ripple component in ac supply?
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
which metal is use in shunt
What is the difference between power cable and signal cable (only Observation Difference)?
Both generator parallel condition shared load equally but one genrator taking ampere more than the other what are all the causes to make like this
A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
why is control bus bi-directional?
for compensate 315mh inductance ,how many capaciance required?
Is it mandatory statutory requirement of transformer oil filtration annualy despite oil is withstanding required dieelectrical strenth and all others parameters