Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When the load on the system is zero and Capacitor bank is on condition, is capacitor bank takes any load?

Answers were Sorted based on User's Feedback



When the load on the system is zero and Capacitor bank is on condition, is capacitor bank takes any ..

Answer / dijindas2

yes

Is This Answer Correct ?    1 Yes 0 No

When the load on the system is zero and Capacitor bank is on condition, is capacitor bank takes any ..

Answer / g. s. panda

As capaciter is a passive element it will not consume any
energy but initially it will take some energy to charge it.

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

How you calculating the 30 Hp 3 phase AC motor of power what size of cable is used for this motor?

0 Answers   Dhanam Enterprises,


tell me about eletrical contractor

0 Answers   TATA,


define the active power?

0 Answers  


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

0 Answers  


what is the major difference between LIBBP & HIBBP.. which one is most preferable..

0 Answers   ABB,


how synchronous condenser is used in place of synchronous generator with out negotiating IEEE standards? Can i use 3 generators as synchronous generators and 2 generators as a synchronous condensers in an IEEE 14 bus system with out disturbing the standards?

0 Answers  


How do you know when the battery is fully charged?

6 Answers   ABB, Pricol,


What is meant by pilot exciter and its working?

2 Answers  


why induction motor takes high current?

1 Answers   Emerson,


For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!

0 Answers   Maruti Suzuki,


how Local Breaker Backup relay working?

1 Answers  


2. What are the parameters of EHT sub-station?

1 Answers   APGenco, Blue Star, Enercon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)