sir please tel me how calucalte kwh if home taken load
30ams how maney kwh taken per day.and 3phase motor 5hp per
hars how maney load teken and how mach kwh and forward me
to electrical table for calicalte kwh and kvr and kvah
Answer / k.prakashchandra
By employing energy meter with required features.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is meant by lagging & leading current
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
Why transformer, generator, ups rating kva?
What are the questions asked in PRDC pool campus test?(bangalore)
How to design CT for connected with Transformer OLTC operation? normally CT output design for 1A/5A range but during OLTC Tap position changing time how to function the CT?
why we use battery source for current transformer polarity testing?
How to calculate or testing the KW in generator
what are the energy savings methods that are existing in coal based power plant?
What is the Load Capacity of Panther conductor (0.2) and dog conductor (0.1)
What is the purpose of earthing Truck ? How does it work for busbar and cables?
Whats the purpose of neutral earthing?
5 Answers Electrical, Hindalco, TCS,
WHWT IS USE OF VACCUM CIRCUIT BREAKER
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)