How ships are protected from lightning?
Answer / er. ankush miglani 0971815107
A DEVICE CALLED MAST IS USED FOR THAT.
IT IS LOCATED AT THE TOP OF THE SHIP.
THIS MAST IS CONNECTED TO A GROUND PLATE AT THE BOTTOM OF
THE SHIP.
THIS GROUND PLATE THEN PASSES THE CURRENT TO THE SEA WATER
WHICH THEN TO D SEA EARTH AS SEA WATER IS A VERY GOOD
CONDUCTOR.
THE MAST ALSO PROVIDES SOME ANGLE TO THE LIGHTNING WAVE
WHICH DIVERTS THE WAVE DIRECTLY TO SEA WATER.
Is This Answer Correct ? | 17 Yes | 2 No |
What is the difference between phase current & line current, how both can be measured in star and delta system
Why Power factor is different - different in all three phase of a 3 phase nduction motor.
Can we loop AC neutral wire with DC neutral wire?
what is the use of megger? and types
11 Answers TNEB Tamil Nadu Electricity Board,
1.what is mean by 8/20 micro sec waveshape
why dc is not given to transformer
how we are measuring the winding temperature of the transformer?
HELLO SIR, IAM PREPARING HPCL EXAMS. SO PLS SEND MATERIAL OF HPCL ELECTRICAL ENG..TO VIJAY_8888@YMAIL.COM
What is voltage ratio of a transformer?
Compare OH Transmission & UG Transmission?
IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.