Hi, I am preparing for Indian Forest Service (UPSC). Can
you please help me to get previous years question papers
(Chemcial Engineerign) (atleast 5).
Answer / keshav
you can download them from
http://examrace.com/IFSpreviousyrpapers.aspx
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the meaning of the critical speed of a turbine, and what are its effects on the shaft line
Define an additive?
What is the difference between multi grade filter and dual media filter?
1 Answers Dalkia, Oil and Gas Jobs,
Why is double the amount of gas collected in one of the test tubes in electrolysis of water than th amount collected in the other? Name this gas?
Explain the significance of the angle of repose holds in the chemical industry?
In Galvonised iron and stainsteel pipes, in which pipe friction losses will more and why ?
What is the difference beteween in specticle blind and slip plate
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.30 : A biochemical engineering sales contract adopts Cost Recovery Method in its company accounting. Gross profit is realised only when cash collections exceed the total cost of goods sold. Let Y = Original Cost Recovered, Z = Gross Profit Realised. Its property was sold at A = $500k with cost of B = $300k. Its engineering accountant receives cash of C = $240k in first year, D = $180k in second year and E in third year. (a) Find the values of Y and Z in : (i) first year; (ii) second year; (iii) third year. (b) What is the exact value of E if all cash has been fully received from sales?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.
sir i am senthil B.Tech Chemical Engineer which book is refer for objective type questions?
Can you pls tell me how to calculate the amphere rating of cable in case of three phase supply but all load is single phase
why u opted for chemical engg?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)