Can you pls tell me how to calculate the amphere rating of
cable in case of three phase supply but all load is single
phase
No Answer is Posted For this Question
Be the First to Post Answer
Question 58 – In the design of a solar power system steps of calculations below are followed : (a) The power output of the inverter of the of the solar panel is 100 watts. What is the power input, Pin to the inverter when the efficiency of the inverter is 50 %? (b) If the rated power of the inverter is 300 watts, how many inverter is needed for the solar panel? (c) Charge controller of V = 12 volts is used to supply power to the inverter. What is the input current I to the inverter? (d) If the charge controller capacity is 10 A, how many charge controllers are needed? (e) If a biochemical mixer consumes 100 watts, running for 2 hours per day, what is the energy consumption in kilowatt hour per day? (f) What is the input energy needed when the efficiency of the inverter is 50 %? (g) If your area receives 2.88 hours of full sunlight per day, how much energy, in kilowatt hour can be produced per day when one solar panel can produce 20 watts of power? (h) If you know that you have to produce total energy as the answer for (f), how many solar panels are needed? (i) Each V = 12 V battery has 5 ampere hours. If the total energy needed is in answer (f), then how many batteries are needed to run the biochemical mixer if without sunlight for 3 days?
Explain how is waste heat boilers categorized?
how will we calculate the heat of formation through electron...??
how can I find out a sulfuric acid recovery plant disigner?
What is carbon sequestration?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
why we messure differential pressure in pascle,mmhg,mmwc like different units in different companys?
Hi, few days back i attended an interview. Currently my employment status is contract basis and interviewer didn't ask me abt mode of employment and he is thinking that am permanent employee in this organization and during the time of joining how I would avoid this problem.
Please convert 1 kg (mass) of Liquid LPG into Ltrs (volume) of LPG Vapor.
Define viscosity?
How is plate heat exchangers used in an ammonia refrigeration system?
What is the pattern of interview questions and which field is of high importance viz., Mass Transfer, Heat Transfer, Petroleum Refining etc ?
2 Answers Cairn, IOCL, Reliance,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)