What are the steps in setting up Oracle GL ?
Answers were Sorted based on User's Feedback
Answer / ahmed moustafa
first thing u need to creat a new set of book which
contains 1- define your currency 2- define ur calendar
3- define ur structure
second u need to connect ur sob to ur responsability in
sys administrator PROFIL OPTIONS then add this
responsability to the user
regards:
ahmed moustafa
| Is This Answer Correct ? | 8 Yes | 0 No |
01- Define Value Sets
02- Define Accounting Structure
03- Define Accounting Segments and Link with Value Sets
04- Assign Qualifier (Balancing Segment, Nature Account and
Cost Center)
05- Compile Accounting Structure
06- Define Calendar Type
07- Define Accounting Calendar
08- Enable Functional Currency and Rates Type
09- Create Ledger and Assign to Currency and Calendar
10- Assign Responsibility to Ledger (GL Ledger Name)
11- Create Category and Sequences
12- Assign Sequences with Category
13- Open Periods
Mahmoud Maher
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / naveen
Define Chart of accounts, calender's, currencies and ledger setups
| Is This Answer Correct ? | 0 Yes | 0 No |
Re: what are the Issue that we face in Gl,PO and AP while Supporting
What is the period end process in AR.What is the reports required for peeriod process
To implement AP from scratch-what is the process?
What is elimination?
what are the measure differene between oracle 11i and R12 ?
A check issued to supplier has become time-barred and supplier returns it requesting for a new check. Can the existing check be voided and a new check be issued simultaneously?
What is Supplier & Supplier site
If scenario I assigned default Mo operating unit and Mo security profile is b so what can able to see in operating unit in payable?
Can anybody tell me, What is the Implementation Process?
in payable module journal entries
What reports should I run before closing the period?
What is price break and what are the different types of price breaks ?