Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How many earthing pits required for diesel generator set ?
Why ?



How many earthing pits required for diesel generator set ? Why ?..

Answer / arun

4 Nos.2 for Neutral and 2 for Body.Providing 1 pit each for
neutral as well as body will also do but if you are running
the DG continuosly , it will be difficult for you to
measure pit resistance which is a activity to be done once
in 2 years as per IE Rule 1956.

Is This Answer Correct ?    24 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is recovery voltage & transient voltage ?

1 Answers   Bhel,


what is second harmonic, how is effect transformer ?.

2 Answers   DEWA,


A car's starter motor draws a current of 100 A at 12,0 V when starting the engine. The mechanical power required to turn the engine is 960 W. At what rate is energy from the battery converted to non-mechanical forms of energy?

0 Answers   Siemens,


Where can I get CPWD electrical specifications & Shedule of rates? Please help me

0 Answers  


What is the comparision (advantages / disadvantages) of 110V, 60 Hz system to 230 V, 50 Hz system.

2 Answers  


How do you select a cable size(cu&Al)for a particular load?

2 Answers  


explain harmonics in simple words..........

3 Answers   HMT,


WHAT MEANT BY SEVICE FOCTOR?

2 Answers  


what is the difference between inductive load and capacitive load?give me some examples in general

3 Answers  


when a cunductor is being disconnected from live cct, still it showing charged, if its checked by line tester?

8 Answers   GEB,


Rotor resistance starter is used to obtain= A increased starting torque B decrease starting current C decrease starting loss D increase efficiency

1 Answers  


coil is consist of

1 Answers   Enercon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)