if 20 hp motor starts directly stars and contenious run .
what will be the effect.
Answers were Sorted based on User's Feedback
Answer / uday
Motor will not run due to all motors are using starter
because saftey purpose
| Is This Answer Correct ? | 1 Yes | 22 No |
can we use the step down transformer to step up transformer
OUR METER READER TAKE READING OF INDUSTRIAL CONSUMER.THEY ALWAYS ASK HOW TO INCREASE POWER FACTOR FROM 60% TO 99 % TO AVOID PENALTY OF POWER FACTOR.
what are the breakdown voltage rating of mini- curcuit'transfarmer!
A resistor,inductor and capacitor are connected in series respectively.Voltage across resistor is 40v,across inductor is 70v,across capacitor is 100v.Then what is the total voltage applied across the elements?
What is the allowalable frequency variation in India and in US? Why there is the difference?
ALONG WITH MEGGER TEST FOR CHECKING OF MOTOR ,WHY WE MEASURE FOR RESISTANCE AND INDUCTANCE?
what is the term of desruptive voltage
5 Answers Bhel, Energy Infratech,
How to calculate the size of the cable? for exp i want to use the load of 10HP
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
why battery is connected in series?
Metal covered multiconductor cables shall employ a marker tape located within the cable running for its complete length in lieu of cable surface marking. Is it true or false?
7- What is the Dissipation Factor and the difference between it and Insulation Resistance Test? 8- What is the task (function) of DC and AC reactors in power plant? 9- What is the task (function) of (open delta with earthed) in some types in transformers? 10- What is the base of the selection of the vector group in transformers? 11- What is the zig-zag transformer and its function by drawing in large detail? 12- What is the polarity ? 13- Why we make short between phase(R) in high side and phase (r) in low side in vector group test? Where High Side ( R ,S and T ) and Low Side ( r ,s and t ). 14- What are the time on delay and time off delay? 15- What is the vector group? 15- What is the task (function) of different types of vector group such as Dyn11 , Dd0 , YNd1,……..,?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)