Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the various methods for effecive earthing in a
factory in a rocky terrain, where soil resistivity is
extraordinarily high? The usual method of 3 m deep earth
pits is not serving the purpose.

Answers were Sorted based on User's Feedback



What are the various methods for effecive earthing in a factory in a rocky terrain, where soil res..

Answer / ashish

If Earthing Resistance Value is more than minimum specified
value & one pit can not serving the you have to provide
Three to Four Earthing Pit Which are Interconnected
Together Making The Earthing Mat So The Total Effective
Value Will be Less.

Is This Answer Correct ?    15 Yes 3 No

What are the various methods for effecive earthing in a factory in a rocky terrain, where soil res..

Answer / joby

here the soil resistivity is high. so mat earthing is provided

Is This Answer Correct ?    15 Yes 4 No

What are the various methods for effecive earthing in a factory in a rocky terrain, where soil res..

Answer / brian

Import good black soil from some where else,mix it with alot
of salt and charcoal dust, dig atleast 2 pits in a space of
10metres apart.
Let each pit have its own earth mat and burry it wit the
mixture mentioned above ie salt, black soil and charcoal
dust and then bond or interconnect the earth mats wit an
earthwire of ATLEAST 35mm2.
Finally pour alot of water in the pits.

Is This Answer Correct ?    6 Yes 0 No

What are the various methods for effecive earthing in a factory in a rocky terrain, where soil res..

Answer / blake australia

There are some powders which harden (i.e. erico make some I
think). Generally would drill a fairly deep hole. insert
earthing rod and surround with these earthing enhancers.
Try to avoid gell or powder forms of earth enhancer as they
tend to wash away when it rains

Is This Answer Correct ?    7 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

what do you mean by synchronous speed of a three phase induction motor?

5 Answers   FlexPoint,


Difference between mcband isolator

1 Answers  


What are diffrent type of road taxes?

0 Answers   Siemens,


66kv under ground cable how to layaing in ground any special case two ckt r runing

0 Answers  


which is the gas used in tube light?

12 Answers  


How to model "IF ELSE" statement in matlab simulink?

4 Answers  


what is the need of representing AC power in sinusoidal waveform? why not in square or rectangular etc...

8 Answers   Lanco,


How the size of electic machine vary with the sped? Between slow and fast running machines of equal ratings, which one is more economical to design?

1 Answers  


How to set a Zone 1 distance relay for distribution feeder?

0 Answers   Schweitzer Engineering,


Dear Sirs, I am a technical persons.In one of our Electrical Sub- Station, We have installed three numbers of 1250KVA ,11KV/0.415KV Transformer to feed the Factory load. We have found some abnormality. In one of our Transformers the leakeage current from transformer body to earth through earth continuity wire is almost 86 Amp but in other transformer it is (5-10)Amp. where the load current on three phase and neutral are respectively 1360Amp,1400Amp,1370 Amp & 176Amp. So please any technical person help me about the reasons of this situation and how I can rectify the fault. Moreover,I have measured the earth resistance of the Earth continuity wire which is less than 1 Ohm. Thanks Tapas Barua

3 Answers  


Explain working of PIU(Power Interface Unit) in Telecommunication,

7 Answers   ACME, ATC, Bharti, HCL, INDUS, Pace Pharmaceuticals,


we have a 2000kva step down transformer at our site. The HT side is charged from 22000V. So the primary current will be 52.48A. So why the HT breaker(SF6 ABB) is rated of 1250Amps ?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)