Do I need a special Transformer to put 240 VAC 3 phase into it and and get 480 VAC 3 phase out of i..

Answer / joseph

The question is rather vague.

Since your machine is rated for 3 Phase, 480V, then just
use a three phase distribution transformer (11/.433 KV).

Is This Answer Correct ?    0 Yes 0 No

Do I need a special Transformer to put 240 VAC 3 phase into it and and get 480 VAC 3 phase out of i..

Answer / rvg.msceb

Transformer can change the voltage levels, but do consider
the current ratings also.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

I have two AC generators, the first rated 2680KVA for 380V/4345A/pf:0.7 and the second rated 3461KVA for 5500V/363A/pf:0.8. I want to parallel the two generator to a bus. The second generator passes through a transformer to down the voltage to 380V and a part of its power goes to another bus so that it's only a part of the total power of the second generator taht goes to the considered bus. I have two Basler DECS100 AVR regulator. How can I make the synchronization ? What others equipments must have ?

1 Answers   CST,


if transformer core is made of copper instead of steel which losses will increase..please explain

5 Answers   Bhel,


What is different between Circuit breaker and Isolater?

0 Answers  


ohms law is applicable for dc or ac current or for both??? explain it berifly??

3 Answers  


why the pressure coil is not present in the three phase wattmeter?

1 Answers  






what is the meaning of harmonic in AC waves and when which are prduce and what is the effects on line and give any other information about harmonics

1 Answers  


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

0 Answers  


why the energy meter disc rotates anticlockwise while reading

1 Answers   KSEB,


can we increase our frequency rate in INDIA?

4 Answers  


design a LV scheme for a 15 storied building?

0 Answers  


How shall i design a liquid rotor starter

0 Answers  


please design a rectifier with batteries for below requirement and also explain how you calculate this solution, Load = 700Amp DC Backup time = 6 hour. please explain briefly ?????

1 Answers   GNFC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)