How much depth we will take in 33kv sub station and why.
No Answer is Posted For this Question
Be the First to Post Answer
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
Give a brief idea about Control circuit wiring in Substation...???
Why in metering Ct for ammeters ct secondary side is grounded for each Ct but not in case of CBCT (Core balance current transformer)..kindly some1 highlights the reason..is it because net flux is zero?
What are the types of instrument transformer?
what is the diffrent between ups and inverter
Which type of control system is expensive — closed loop or open loop?
what is NANO TECHNOLOGY?
What device is use for metering current at lt consumer end..??
Can clean earth cable be considered as low current cable
Three phase power is measured with two wattmeeter for balance three phase load.the reading of one wattmeter is zero.we can conclude that the power factor of balance load is?
how many wires need to be bring to the motor if its star delta starter
how to use single phase supply for a three phase equipement.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)