Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.
Answers were Sorted based on User's Feedback
Answer / deepti
The criticality/severity and the impact of the bugs should
be communicated to the Client.
Incase the client agrees to receive the build as it is, the
documented concent should be taken along with the
implications.
Else should be informed of schedule slippage.
No client wants a low quality build-specially if it can
lead to system failure. Convince the client and deliver
correct tomorrow rather than delivering incorrect today-
its a matter of reputation, not time.
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / sathya
Definitely I will release the application by specifying
the issues in the documents as KNOWN ISSUES
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / deepti
The criticality/severity and the impact of the bugs should
be communicated to the Client.
Incase the client agrees to receive the build as it is, the
documented concent should be taken along with the schedule
implications.
No client wants a low quality build-specially if it can
lead to system failure. Convince the client and deliver
correct tomorrow rather than delivering incorrect today-
its a matter of reputation, not time.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / deepak
first of all i will try to convince my client by telling
that if this problems are not solved then the software
which is released is of no use so give me some days of
timing so that your software will be bug free then i will
solve hi severity problems first and if there is time then
i will go for low severity problems.
| Is This Answer Correct ? | 0 Yes | 0 No |
First of all this will not happen in the real time
scenario. If we assume that there is no Test lead, No Test
Manager and QA Manager and I am the only Senior Test
Engineer who is going to handle this issue I will proceed
in the following procedure.
1. If the bugs are not found before the client?s
pressure, I will make my team work for overnights and try
to find the bugs and report the same in time so that the
developers will fix it in time and will make the product
release in time.
2. If the development of the product is also with our
company then and if I am the only person to take care of
fixing those bugs, I will follow the same procedure as
in ?1? with the development team. This increases the level
of confidence on us for the client.
3. In both the scenarios I will try to concentrate
more on High Severity bugs compared to Low ones at the same
time I will not leave the Low severity bugs. Because high
severity bugs may be blockers which will allow the
application to work up to the mark when the Client sell his
product to his clients.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rao
If you found these bugs and logged them before client's
presure,where we have ample time to discover these bugs.In
this case,there is no problem for testers,but the presure
will be on the developers,if he is not fixing the bugs in
time.(This is applicable ,when the client moniters your
daily status).
If you found these bugs and have not logged them before
client's presure,where we have ample time to discover these
bugs.This is the major issue to make convienience them.You
have to convienience him why you missed out those bugs,when
you have plenty of tile to discover with your proper
workarounds and the analasys.In this case,major problem is
for Testers and the developers are cool.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / raj
If you found these bugs and logged them before client's
presure,where we have ample time to discover these bugs.In
this case,there is no problem for testers,but the presure
will be on the developers,if he is not fixing the bugs in
time.(This is applicable ,when the client moniters your
daily status).
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sastry
I would update the client about the status. If the client
is looking for a high quality product I will get sufficient
time to fix these issues. However sometimes based on the
defect severity and time to market, client may agree to
release with these bugs as known issues
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nithya
I try to convince my client if they not understand the
problem . I form a team and debug the high priority bugs and
handover the project because low severity bugs not affect
the project severely ..
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / hareeskumar
Maximum clients give the due date.At the end of the day we still have bugs means at that time we will take the SLA(service level agreement). At that time we will resolve the bugs and give to that client.
| Is This Answer Correct ? | 0 Yes | 0 No |
what are testing you will do in system testing
what is suspension criteria in your test paln and explain one suspension criteria in your test paln,... pls give one real time example
I am new to testing, I need information about TSYS any website or if you have information please mail it to me. this is for online credit applications project.My mail id is keerthanakoluvu@yahoo.com. Thanks for your help.
0 Answers Bank Of America, TD,
What is CMMI?
What is Testcase? How to define seviority and priority of a bug?Explain me with example?
Hai, Iam Venu completed BCA with MBA in May 2007. Now iam learning Manual Testing .So plz help me if you find any Interview or if you find any software trainee chance in testing ?9347727155
what is traceabiity matrix
what is spiral model?
Is apllication is window base or Linux base it create any diff. from QA point of View.?
1. fault based testing is reversed of which testing? option.1 conventional software testing Option 2Operations and classes that are critical or suspect Option 3 Use-case validation Option 4White-box testing of operator algorithms 2. Testing OO class operations is made more difficult by Option 1 Encapsulation Option 2 Inheritance Option 3 Polymorphism Option 4 Both Inheritance and Polymorphism 3. Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning 4.Client/server architectures cannot be properly tested because network load is highly variable. Option 1 true Option 2 false 5. Real-time applications add a new and potentially difficult element to the testing mix Option 1 performance Option 2 reliability Option 3 security Option 4 time 6.Which one is not key term used in internal control and security Option 1 Threat Option 2 Risk Control Option 3 Vulnerability Option 4 Exposure 7.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products. Option 1 true Option 2 false 8.Static testing requires...? Option 1 Binaries Option 2 Source code Option 3 Product Option 4 Executables 9.etesting is testing the application with multiple sets of data is called retesting Option 1 true Option 2 false
What is integration testing?
what is port testing?when it is going to be done?