Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.

Answer Posted / deepti

The criticality/severity and the impact of the bugs should
be communicated to the Client.
Incase the client agrees to receive the build as it is, the
documented concent should be taken along with the schedule
implications.
No client wants a low quality build-specially if it can
lead to system failure. Convince the client and deliver
correct tomorrow rather than delivering incorrect today-
its a matter of reputation, not time.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Suggest some book to learn more test case???

933


what are the typical problems in web testing?

274


What is exploratory testing and when should it be performed?

262


Can test condition,testcase and testscript help u in performing the static testing

1132


What are the cases why parameterization is necessary when load testing the Web server and the database server?

1101






What is a testbed in manual testing?

261


What are some best practices that you should follow when writing test cases?

236


What are the interview question on insurance domain in manual testing

17329


Did you ever worked with B.A's and when?

1183


What is mean by Schedule report who is the responsible for generated that one ?

1290


Hello. I am not here to answer your question. I jus found a job as software QA engr. And i am totally new to software testing. So can someone pls help me in the following scenario? there is this registration screen, and it contain: One textbox called Nickname which only accept alphanumerical One textbox called Contact which only accept numerical, One textbox called Email which can be filled with alphanumerical and symbol and One button called Register now becos there is so many textboxes, where i can filled with alphabet, number, symbol, "just space", leading zeros, leading space. there will be lots of combination. can someone pls help.. i will be appreciated if u can post the test case of the scenario i mentioned. Lots of Thanks

1225


How does quality control differ from quality assurance?

246


Hi, i am looking job in perfomance testing using Loadrunner can any body help me a project in any domine plz(Usah) chs_29@rediffmail.com

1226


What is build interval period?

1425


What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?

2065