Answer / @mit
Suspension Criteria comes under Test Plan.According to
this, QA Manager have the rights to Suspend the Build or
Testing if some serious defetcs come across or due to
unavailability of Hardware or Software. Below are some
criteria by which Manager can suspend the Build or Testing
cycle:-
-If some Major defects effects the application(like stop
Testing,Block some functionality etc.)
-Unavailability of Hardware/Software.
-Build is Unstable
In Test Plan document,if there is Suspenstion Criteria
mentioned then there should be Resumption Criteria also.
According to this,if Testing Cycle or build is Suspended
then on what basis Testing Team will Resume the Testing.
Followinf criteria are considered into this:-
-If Build is suspended due to some serios issue then verify
the Defetc and make sure it should be FIX by others.
-If Unavailability of Hardware/Software then verify its
availabilty .
-Verify the stability of build if any.
Plz correct me,if i m wrong.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / balakiranm
The below conditions are satisfied the
suspend the build from testing.
1.Sanity test is fail
2.Build is unstable.
3.wrong build is given.
4.Release notes doc is not provided.
| Is This Answer Correct ? | 5 Yes | 1 No |
Hi,iam geetha i want to know about the different type of testing for the webapplications. Since iam doing only manual testing, i want in full details about webapplication testing. Thanks in advance
wht is test scenario?
Explain V model in depth?
who will give priority for testcase?
Can you explain function points?
What is regression testing and what are the types in regression testing?
1>what is defect matrix? 2>which is the high priority bug in "Open Window"(when we open some file the window get appear)
what is diff between stress & load testing
what r the fields present in requirement tracability metrice (RTM)?please explain each and every field as i m not aware.
what is the framework followed in ur company?
What are the cases when you’ll consider to choose automated testing over manual testing?
what is entry and exit criteria?