Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.
Answers were Sorted based on User's Feedback
Answer / pranab panda
Hi
If we are using Test director and the client is accessing it
then he can easily know the bugs(High or Low priority) from
the Test director only.
He will directly ask the developer since tester has nothing
to do with bug fixing.
If the bugs are maintained in Excel sheets(Offline) and
If the client asks for the build better discuss with the
developer and inform their view to the client.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / sreenu
Depending upon severity we will decide shall we close the
project or not?If the budgs high severity we donot close
project.IF the bugs are not giving any problems to the
client so we will give it for release
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / software_testing_pune
The best way in this situation is to mention the bugs which
are assosicated with the build in document called "Known
Issues".
--- Reply me if i am wrong..:-)
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / rachana
First, I will try to convinience the client to give the
time to fix all the bugs. If he is not convienced with my
idea, mean time I will fix the low priority bugs. By the
end of the discussion, I will show him the fixed bugs. By
showing these, I will try convience him to fix the high
priority bugs. If not, I will tell the client that the
application will not be the bug free.
| Is This Answer Correct ? | 0 Yes | 2 No |
What are the Test Deliverables?
10 Answers Banking, Burndy Technology and Global Business Services,
what is functionality testing?? what is system testing?? does system testing involves functionality testiting??
FOR TEST THE RESOULATION OF IMAGE ETC WHICH TYPE OF TESTING WE USE
Hi frnds im Priyan.in interviews they are one question 4r me.i have been asked this one in 4 interviews.." AS A TESTER, WHAT IS UR GOAL OR AIM OR AMBITION..? ".. can any one gve answer perfect answer ? tank u .. reply me plss
If a webapplication is handed over and you are requested to come out with a test strategy. what are all the key things will you include in test strategy?
wat iz self join write qeriry for table
How can you prepare the resume for testing? Can you send me the answer for this questions?
what is build? what is build coniguration?
what is system testing? as test eng, what do u do in sys testing? who invoves in sys testing?
Hi....Friends....If anybody having Sample CSTP question papers, pls send it to the following Id... Thanks n advance... theramkumar@gmail.com
What are the benefits of requirement traceability?
what is the entry criteria and exit criteria of integration testing?