primary treatment of sewagw consist of
removal of floating materials
removal of sand & grit
removal of organic materials
all above
No Answer is Posted For this Question
Be the First to Post Answer
how to take quantity in triangle section for calculating tender purpose
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Construction joint of beam & slab is provided at––
why 1.25 factor is to be multiplied to cylindrical strength of concrete while getting the equvalent cubical strength of concrete?
What is the roll of face bars in beams
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
one cricket ball through in chennai and jaipur same speed where bowl has fast speed
why curing is necessary?
How do you change a dimension value in solidsworks?
TELL ME THE EQUATION FOR OGEE SPILLWAY
for mortar 1:18 how much cement and sand required for 1 CM
how should we take soil sample for CBR test?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)