Draw an S.L.D of the main panel for a hospital, showing meter position.
Essential loads are:
1) Equipment load 100 KW
2) Critical load 500 KW
3) Life AID Safety load 400 KW
4) NON-Essential load 200 KW
5) Other service loads 200 KW
Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
No Answer is Posted For this Question
Be the First to Post Answer
What will happened if the neutral of secondary of Xformer ( Star point) Note it's above KVA rated Xformer
why white color LED light is not possible?
How can I calculate the require lumen of a room. If I use Tube Light (40 W), Or 100 W incandescent lamp. Please give detail answer.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
what is electric current
roles of owslaw explain?
What is conventional thermal current (Ith)
what is tesla ?
Is there any difference between load based power plant and coal based power plant?
Which type of starter to used which type o motor
Slipring moter find external resistance
what is interfacing in computer studies?