Rate analysis of Design mix concrete M50 and M60 DMRC
No Answer is Posted For this Question
Be the First to Post Answer
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what is a pretension and post tension with an example
what is the ratio of concrete to steel? what's its value??
internal dia of sewer pipe should not be less than A] 15 cm B ] 20 cm C ] 25 cm
93 sqmtrs area how many sand and how many cement is requir in 1;5 ratio
how much the ratio of the m15, m25 .......etc
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
What is the diff. Between rectangle & parallelogram?
is it compulsory to cast columns along with beams & slabs for monolithic joints
how to the steel dia without using d2/162
what is difference between design mix and nominal mix,where the design mix is used?
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)