Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


We are dealer in Maharashtra State & We have recd. form C from dealer of Maharashtra State against our E-1 form. Now assessing authority is asking for counterfoil of our E-1 form. But, our E-1 form counterfoil is misplaced somewhere & assessing authority is disallowing the C form which is recd. from Maharashtra State.Please let us know the option for allowing C form?



We are dealer in Maharashtra State & We have recd. form C from dealer of Maharashtra State again..

Answer / d p sawant

We have submitted LR copy with C form for showing sale in transit

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how many by pass system in online UPS.

4 Answers  


400 kvtransmission lines in india are connected in star or delta

10 Answers   NTPC,


Can we pass 11kv power in 1.1kV voltage grade cable.If not why?.

3 Answers  


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

0 Answers  


what is the formula for backup time of online ups?

1 Answers  


we r having 3 core 3 1/2, 4 core cables how we can know this cable has to be used for this purpose?

5 Answers  


How to Decide(calculate) Bush bar size for copper and aluminiam ?

0 Answers   Essar,


What is cp system and why is it required.?

1 Answers   Essar,


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

1 Answers  


practically What is power factor

6 Answers  


On which side, taps are provided in tap changing transformers and why?

2 Answers  


What are the essential parts of a transformer?

2 Answers   NIT,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)