We are dealer in Maharashtra State & We have recd. form C from dealer of Maharashtra State against our E-1 form. Now assessing authority is asking for counterfoil of our E-1 form. But, our E-1 form counterfoil is misplaced somewhere & assessing authority is disallowing the C form which is recd. from Maharashtra State.Please let us know the option for allowing C form?
Answer Posted / d p sawant
We have submitted LR copy with C form for showing sale in transit
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
hello if any one have papers vof hpcl or sail, plz send me
Why a tesa lamp is glow between two phase?
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
Calculate torque developed by the 3-phase, 5 H.P., 4 pole induction motor runs at 1500 rpm A 23 N-m B 21 N-m C 10 N-m D 0 N-m
at what rate the micro controller increment its timer....is it 1micro seconds or 1/(12*10^6) seconds
bus bar design conditions and sizing pls tell me quickly
I have a reading off 1.5ohms at my mem my main c/b is rated at 40/6 amps in a domestic house and i was told to change it to a b curve c/b is this ok
how to measure dc earth leakage current?
What are the classifications of oscillators?
how u select control transformer for a mccb panels or any panels?for expample we hav 440 volts maim supply and control volts is 230v?
How to calculate multiplication factor in kva example 500kva ans pls ?
If the line voltage is reduced to 75% of its rated value then by what percentage current will reduce ?? 75% 25% 50% no change and why ?
what is mppt (maximum power point tracking ) and how they used in solar power generation ??? what are the main components used in mppt?????
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.