how to calculate required shuttering material like
props,spans,plates ..etc for a slab?
Answer / sahilshah.civil@gmail.com
Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end
Is This Answer Correct ? | 6 Yes | 1 No |
You have casted a column above your footing, and you found out it is off its location by 5cm. What would you Do?
What are the phases inspections are done by local authority while construction?
what is isoseismal?
what is meant by civil engineer?
how many liters of water required for 1cu.m concrete?
material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)
What do you mean by the word 'shear'?
what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?
which type of test carrying on the cement & why
Which of the following states has become the first Indian state ( in August 2016) to distribute 2 crore LED bulbs under Ujala scheme of union government? A) Gujarat B) Madhya Pradesh C) West Bengal D) Maharashtra
what mean By core Billing
how much quantity of binding wire required for tieing of 1mt of reinforcement bar?