how to calculate required shuttering material like
props,spans,plates ..etc for a slab?
Answer / sahilshah.civil@gmail.com
Props 450 mm C/c
Span near beam 1 nos each & mid span spacing will be 600mm c/c
Plate start from beam end
| Is This Answer Correct ? | 6 Yes | 1 No |
What is a deep beam ? Explain ?
roll of DLC in road constructions
What is the procedure of concealed plumbing in toilets?
why do we provide haunches in rcc box or underpasses?
trapozidal
What is the diff. Between rectangle & parallelogram?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?
8 Answers ABC Enterprise, Alstom, Badri Rai, IOCL, L&T, MICCO, NKC, PDC Construction,
What is portland cement
How to find weight of 1cu.m concrete in varies grades? and giive calculation.
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)