Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work
Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work
Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work
Q 4) 100 SQ FT roof slab concreting ____________mason and labour required


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

what is the use of water bar in water tank and is this an extra item in estimate?

0 Answers   PS Constructions,


1.what is the main responsibilites of Site Engineer ? and what are main attitude ?

3 Answers   UltraTech,


if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??

1 Answers  


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

0 Answers  


what is the difference between composition of ceramic & glazed tiles?

2 Answers  


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

0 Answers  


How many layers in 12mm and 18mm plywood?

6 Answers   JMC Projects, L&T,


How much for the BRC lapping in full yield and half yield < and which table to get it ?

0 Answers   Engtex,


what are the changes in concrete pour height as per IS 456, 2009?

0 Answers  


What is BOQ why to calculate BOQ

4 Answers  


hello; sir. i would like to be an assistant executive engineer in irrigation department. is it really necessary to take coaching? or can i prepare myself by studying any study materials available in market? if so; what are the books i have to purchase. please reply soon.

0 Answers   NCC,


The corrosion resistance of a material is.

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)