Q 1) 1 Mason and 2 LABOUR / _________CUM brick work
Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work
Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work
Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
No Answer is Posted For this Question
Be the First to Post Answer
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
How to calculate quanty of steel in four leg stirrups?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Please tell me about surveying standard chain details.Thanks.
What is meant by a context menu in a cad software?
Explain what is zoning permit?
what will happen if we use milk or oil in the place of water in concrete??????????
what is the difference b/w GSB and WMM?
what is cross hair cursor?
colum 500*500 8mm cutting lenght
which grade of cement mostly used in construction and why..??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)