Q 1) 1 Mason and 2 LABOUR / _________CUM brick work
Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work
Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work
Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
No Answer is Posted For this Question
Be the First to Post Answer
what is the mix design for M45 concrete
What is the use of array command?
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Water absorption for stone and first class stone bricks?
What is the formulae of percentage of steel
What should be the PH value of water for irrigation purpose
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
how much cement and sand 1:6 plastering
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
why does only water ads in concrete?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)