If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
No Answer is Posted For this Question
Be the First to Post Answer
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
Adout concrete
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is zero slump concrete
stub column means
What is the worlds largest concrete dam?
what is the minimum & maximum compressive strength n/mm2 of M-30 mix design cube
How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum
22 Answers Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,
fe415
Describe the advantages and disadvantages of using plastic and timber fenders?
diffrence between mjb & mnb
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"