Answer / banda saivarun
it is a Vector group of transformer
Vector group means it defines the primary & secondary side connection type. It says D for the delta connections (windings connected between two phases) & Y for the star connections (windings connected from each phase to ground). The 11 stands for the phase displacement of the secondary referenced to the primary. Imagine a clock with only an hour hand; at 11 o'clock, the hand is at 30 degrees to the reference (12 c'clock), so the secondary is at 30 degrees to the primary. tor group of transformer
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / nikhil karle
this is vector group of xmer
Which is stand as
D delta(primary)
Yn star with neutral (secondary )
11 30°lead
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / mageshwaran
it denotes the connection of primary & secondary winding of transformer, in which primary is delta connection and secondary is star connection with 30 degree phase displacement
| Is This Answer Correct ? | 0 Yes | 0 No |
whay is snubber circuit , why we are using snubber circuit in thyristor
What is the minimum distance to be maintained in between HT panel and LT panel and Instrument panel as per IEC and NEC standards?
sir i have a car stereo system and there is jack on him so can u tell me a way to find out their power terminals on the jack or on the circuit board"
in electrical fire which group fier Extinguisher as used
State thevenintheorem?
What is the size of a 60 watt and 80 watt tubelight?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
What are the testing to be done before the installation of 1000 KVA Transformer?
In a flange coupling, the flange bolts are designed for
What will happened if the neutral of the (star connected secondry) Xformer disconnected? (if its Above KVA rated one)
please send me RRB electrical engineer previous year questions for Sr. Section Engineer
WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)