Answer / pavithra
Binding wire consumption 8kg per metric tonne of steel. Therefore 0.008kg(8g) per kg of steel
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / suresh sathanur
Quantity of binding wire required per ton or per kg ( or by % of reinforced steel is generally depends on many factors like spacing of steel bars ,Dia of steel bars and method of binding etc . But in normal construction generally the quantity of binding wire required will be in the range of 2 to 3% by weight of reinforce steel.
Is This Answer Correct ? | 0 Yes | 2 No |
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
how to calculate cut length of for a triangular portion for steel ?
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
How many pyramid in egypt?
How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
What are the tests to be conducted on cement?
mix design procedure for 1:6 cement mortar
Why we use Reinforcement out side of the column not in centre
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is structural frames or systems?
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate