why provide water stopper in costruction joits
water stopper is generally 250 to 300 mm parallel to the
retainging wall. half portion inserted in to the concrete
and half portion cast 2nd time concreting work so when
water is penetrating through the joint it is retain by
water stopper.
| Is This Answer Correct ? | 5 Yes | 0 No |
is plate load test can be done on cohesive soils for immediate settlements ?
how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
Define polar co ordinates.
Difference between lime, distemper and plastic emulsion?
what is the strength [final]of grade m 15 to m 45
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
can we use .5 water-cement ratio for any type of cement?
For 1cu.m how many bricks required practically
which percentage is maximum in good quality cement?
14. List 3 of your strongest points as a worker?
Civil engineering related
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)