A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .
No Answer is Posted For this Question
Be the First to Post Answer
What will happen when we will connect lamp in between phase and earth.
why we used star delta starter for above 5hp motors
State nyquist stability criterion.
WHAT IS THE FULL FORM OF CABLE TYPE-AYWY,AYWAY,YWY ?
How many earthing pits required for diesel generator set ? Why ?
I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com
What is ELR, and where it is used ?
what will happen at the time of CT saturation?and what will be the Relay's function at the time of CT saturation?
is it possible to run the any motor when winding grounded? how?
What is C.T, why it is used and what care should be taken for that while connecting?
20 Answers Bhushan Power Steel,
How many types of electric motors are there?
why we use perllel conection system in the wiring?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)