What is "L" provided at the base of column??
Answer / m hari
L is provided in column for standing well.
If we provide only sraight then it is not well bonded. & Fall down.
So binding to the base the short span of L, it is provided.
Is This Answer Correct ? | 0 Yes | 0 No |
can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure)
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
why main steel is to be reinforced in shorter direction in case of slab?
what is the average steel consumption in multy storey building as a residential and commercial?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
what is the significance of soundness test in Cement? and how is it done??
1 Answers Biltech Building Elements, Student,
what is the minimum & maximum compressive strength n/mm2 of M-30 mix design cube
How to arrive d*d/162 , for finding the kg per meter , wt of steel
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
calculate if the size of the beam is 300*500 then L for the top & bottom bar
Dear Sir What is the Contraction joint for base Slab
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u