What is "L" provided at the base of column??
Answer Posted / m hari
L is provided in column for standing well.
If we provide only sraight then it is not well bonded. & Fall down.
So binding to the base the short span of L, it is provided.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the most suitable foundation when construct a bird watching tower in a marshy land
What does a construction cost covers and what does not?
water leak detection system question & answer
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
can you give me the details of rate analysis of steel and concrete?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
wat would be the probable interview questions and GD topics for IOCL exam?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What Are The Different Type Of Slump Test Indications?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How many cum of 9.5mm stone in 1 ton ?
Define What is the force exerted by the Tacoma narrows bridge?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Define a polyline?
how to calculate the concrete mix m30 by volume