what is that one cub metre plaster in cemant and fine sand
No Answer is Posted For this Question
Be the First to Post Answer
If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
What is Refuse Area ? And What is Definition ?
Why we do soil classification?
i need a labour rates of all civil works ? eg) brick,pcc, smm, inner plaster,outer plaster,centering, bar-bending. and also need all material rates latest?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need
what is slump
5 Answers JMC Projects, Puravankara,
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What is the snap size in civil and how can we create it?
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,
What is braced excavation all about?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)