brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is polity

1650


how to convert cement, sand aggregate quantity from M3 to kg with full description?

1591


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

696


How do you maintain water pressure?

652


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4550






.5Ast

1343


In a concrete grade C35A, C & A stands for what and equalent cube strength?

3108


What are the materials used in building a gravity dam?

645


Define What is passive earth pressure ?

693


Describe the sections included in a typical bill of quantities

1787


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1220


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1322


What are the benefits of rcc pipes over steel designed pipes?

785


a butt weld is specified by

2587


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2382