1:6 brick masonry cement and sand calculations
Answer Posted / sooraj singh
cement=1
sand=6
sum=1+6=7
dry motor brick work=0.40cum
1 cum brick =500nos
1 cum brick masonry calculation.
cement=1*0.40/7=0.05714bags
sand=6*0.40/7=0.3428cum
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what are the challenges of being a team leader and a supervisor?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
How to calculate paint drums per meter square
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
what is the difference between natural draught cooling tower and induced draught cooling tower
How is calculate the cube molt
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
what is relation between SPT N value and driving piles after conducting a soil test?
what are the types of design? which type of method is used at what type of design & why?
which formula used for calculate the area of segmental arch?
What are the steps involved in the concreting process?
Which are the Steel tests ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What is passive earth pressure ?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??