1:6 brick masonry cement and sand calculations
Answer Posted / sooraj singh
cement=1
sand=6
sum=1+6=7
dry motor brick work=0.40cum
1 cum brick =500nos
1 cum brick masonry calculation.
cement=1*0.40/7=0.05714bags
sand=6*0.40/7=0.3428cum
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what is escalation?how it is done?
How did street originate in the plumbing term street ell?
Which is the direction of negative angle?
how many time use of plywood shuttering and IS code
what is the hanekom repairing material after concreting work
is basic cost of the material includes tax?
what is the difference between prime coat and tack coat in road construction
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Dear Sir What is the Contraction joint for base Slab
How to marking the building
Which IS Code/American Code applied for coupler test of steel
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
Pls explain me about tension and compression in a flat slab
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Explain moment of inertia and its importance.