Engineering method, why need is column kiker??? what is necessity??
Answer Posted / saquib hassan
kicker required to maintain proper verticality and column layout size.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is bylayer?
How did the romans get water up hills using aqua ducts?
what is the most suitable foundation when construct a bird watching tower in a marshy land
how to calculate MR 9(derivation)
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
How many types bend used in civil reinforcing
how to determine H- zone in a column? where it will occur?
Which purpose we use deck anchor in bridges?
Why joints are provided?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
how can we calculate steel value, depending on load