Engineering method, why need is column kiker??? what is necessity??

Answer Posted / saquib hassan

kicker required to maintain proper verticality and column layout size.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate sand , cement quantity for 23mm thk brick work(10x10)

4730


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2372


What is bylayer?

686


How did the romans get water up hills using aqua ducts?

808


what is the most suitable foundation when construct a bird watching tower in a marshy land

1430






how to calculate MR 9(derivation)

2322


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1448


How many types bend used in civil reinforcing

2786


how to determine H- zone in a column? where it will occur?

1770


Which purpose we use deck anchor in bridges?

644


Why joints are provided?

687


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

1813


How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?

6387


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

1671


how can we calculate steel value, depending on load

1758