Please any body describe me manpower used calculation for a building construction.
Answer / balaji
its is depending on construcion of building
layout sqft
and in this different types of work origination in in thi sfiled
| Is This Answer Correct ? | 6 Yes | 2 No |
what is the main disadvantage of concrete at environmental point of view.
What is density of crush sand and fine aggregate
Wat is the optimum value of tensile strength of concrete after 28 days??
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
detailed calculation of the amount of cement used?
what are the Cement Coefficient for Block Work & plastering Work?
why secondry beam rest on primary beam
1 Answers Exotica Housing Infrastructure,
how do you calculate cubic meter to brass
bridge design
how much the ratio of the m15, m25 .......etc
consumption of cement in p.c.c. a. mix. 1:1:2 b. mix. 1:1.5:3 c. mix. 1:2:4 d. mix. 1:3:6 e. mix. 1:4:8
why there is no concrete mix of ratio 1:.5:1
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)