Please any body describe me manpower used calculation for a building construction.
Answer / balaji
its is depending on construcion of building
layout sqft
and in this different types of work origination in in thi sfiled
Is This Answer Correct ? | 6 Yes | 2 No |
how to calculate length of bar
How to increse bearing capacity in soils (Stabilisation of soils)
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the cutting length formula of tringle ring?
levelling least count
what is flexible and rigid footing?
0 Answers IBM, Wah Engineering College,
In site how we can identify one way slab and two way slab?
11 Answers Parth Constructions,
What are the causes of failure of foundations and remedial measures?
if we make b.b.s then bend correction is taken how much..
What is the strength of concrete with ratio 1:4:8 as per British standard or ACI
how to calculate the number of cement bags required for 1m3 of work
Diagonal check is required for a layout work to confirm ––