How can step up and step down process in power transformer
Answer / vinoth
Power Transformer Step UP and Step Down Process was Doing,
Basically This process depends upon No of Turns/windings of Primary and Secondary
If Step Up process,The no of turns is high in Secondary then Primary
If Step Down Process The No of turns is less in secondary then primary
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the diffrence between an ELCB(earth leakage circuit breaker) and RCCB(residual current circuit breaker)?which has higher degree of safety and why?
HI,how to know that the MEGGER which i am using is working properly,reply....thankyou
How to reduce the static electricity producing in solvent room? By P.D.Patil BioCon
how to calculate transformer turn primary & secondary side 11kv to 420v
how we can calculate power factor in single phase & three phase ?thank u
could i arrange a faulty and healthey battery bank togather in parallel , if your ans is not then why?
wath is this mining of dg
Advantage of 11KV ring main system with open point
1 Answers Alam Group of Companies,
how to find out speed of single phase motor
What is oil temprature with A/T contacts in Transformer ?
how generator load test is conducted?what are the steps?
Where double earthing is required? Is there any power specification to have double earthing?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)