what is the stripping time of beam column & slab?
Answers were Sorted based on User's Feedback
For Beams sides only 1 day
For coloumns 1 day
For slabs span<4.50m 7 days
For slabs span>4.50m 14 days
| Is This Answer Correct ? | 14 Yes | 0 No |
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
how much tempareture are required to make liquid state of pid leed
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.
what is the difference between NP2 Class and NP3 Class RCC Hume pipes
how did find the quantity of cement ,sand , and aggregate in concreat which is givan by volume
slump test report
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
How to estabilish reinforcement Steel rolling margin for a building projects ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
If a 20 years old building without columns was going to renovation having a thickness of walls 12" is it Withstand the load of a new structure of having load of 1150k.g including live&dead loads?
1 Answers Construction, Ryna Facilities Services,
What happens to Load at yielding ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)