how to calculate the quantity of material in 1 cubic meter Concrete?
Answer / kashif khan
Qty of concrete= 1 cum
wet volume = 1 cum
Dry volume = 1*1.54 = 1.54
First of all we calculate the ratio of concrete e.g 1:2:4
2nd step; Sum of ratio = 1+2+4 = 7
Qty of cement = 1/7*1.54 = 0.21999 cum/0.035 = 6.2854286 bages
Qty of sand = 2/7*1.54 = 0.44 cum
Qty of crush = 4/7*1.54 = 0.88 cum
| Is This Answer Correct ? | 17 Yes | 0 No |
what is the mix design for M45 concrete
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to convert aggregate and sand from kgs to ltrs ?
07. 4 main points about check list for rebar works are– ––
what ratio of cement and sand we used for making cover
how can we calculate steel value, depending on load
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
Define What are the reasons for geotechnical site investigations in Uganda?
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
why we providing 40mm cover to columns & 25mm to shear wall
L/3 and l2 and 1.5l is use for reiforcement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)