In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer Posted / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
to draw bm diagrams for portal frames under different loadings//
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
how to preaper for interview wat they asked in interview give me idea
For the construction project what capital cost has to be taken in consideration?
What are the techniques to measure road difference?
how to calculate freeboard in under ground water tank and technical details
Is there any course for billing available in Mumbai? If yes then please mail me the details..
Whats the meanig of ,'K' VALUE in the case of soil.....
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
what is tension & compression of steel bending.
is concealed wiring a problem in fly ash brick wall?
What is the difference between EPC,DBOOT and BOOT.
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is structural frames or systems?