Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?
No Answer is Posted For this Question
Be the First to Post Answer
lenz law application and define
Capacitor bank require for 1000amp load
2 Answers Biodeal, Pharmaceutical,
For which purpose the temp. rise test of transformer is conducted?
percetans
what are the safety in transformer,diesel generator,ups, chiller plant,h.t. , L.t. , sewage treatment plant(stp),water treatment plant(wtp), fire. plz ans. me in detail if you know any of the mention above. i urgently need
2 Answers Claris Lifesciences, EFS,
We have three phase dg of 12kva rating.If the load of each phase is not constant.That means one phase drowning more load than remaining two phase..Then what will happen to dg?
In 3.5X150 Sq.mm cable what does 150 stand for outer dia or inner dia?
why there is a phase difference between line voltage & phase voltage ?
if one of the phase is failed to 3 phase IM. what will happen?
Why short ckt does not happen when solenoid coil connected to supply. as its a wire only.
friends., why celling fan rotate cockwise direction and wall fan anticickwise direction ?
Why do we perform an open-circuit test and short-circuit test on the transformer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)