How many binding wire is use in arrangement of 25mt steel
Answer Posted / shweta garg
in steel reinforcement binding wire required is 8kg per MT, so for 25MT the binding wire required is 25*8= 200kg
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
dialation means
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
what is idealized curve for concrere and steel
The concrete slump recommended for beams and slabs; is?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
what is pqc
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
can stub column take the load as main column
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What is the absolute pressure scale?
how to calculate reinforcment in staircase cranked beam?
what is total volume of ingredients used in concrete accordingly