what is the length of a steel bar when it buy for the site????
Answers were Sorted based on User's Feedback
Answer / ankush rathod
12m lentgth of abar when we buy by the site at first time
Is This Answer Correct ? | 14 Yes | 1 No |
Answer / musa
Assume 3×4 m room then it is 2 wall should by plastering by 1 mason and 1 helper
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajan pandey
one mason & one helper how many foot plastring in one day
Is This Answer Correct ? | 0 Yes | 2 No |
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is the meaning of 'variation' in construction of residential buildings
Beam test is carried out for?
What is the accepted silt content in sand for concreting purpose by volume method?
Why the finite element method is lower bound solution?
Why you are leaving present job?
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
how material can be calculate for brick work in 1:6
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
why steel is used in rcc columns? what is its purpose?
how to find out hard strata in bored pile when the DMC method adopted.
what is minimum reinforcement required for rcc works