On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
No Answer is Posted For this Question
Be the First to Post Answer
PERT Chart
why are you joining in this (applied post) job and your aim for this job
What is m & 20.& what is fe&415.
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
What is the purpose of the gap in the road on this bridge?
Wat are the elements consider in the shuttering load design calculation
how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
in the footings first which reinforcement bar has to be layed as per design criteria.
how to calculate steel quantity in plinth beam&footing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)