If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
No Answer is Posted For this Question
Be the First to Post Answer
What is grouting? Why it is done?
wat is the necessity of finding shear and bending moment in a structure. wat will happen if it is not consider. other than shear cracks and deflection is there any other failure happen.
How much cement is require in one sqft area in a G+3 residential construction.
how many pcs of steel bundule in all dia 8,10,12,16,25,32,40 please how many pcs in bundle of packing??
what is period of de-shuttering for different area of slab of M25 grade?
What ingredients with% found in ppc cement??
List out the potential risk factors for workers on the construction site?
what is meant by camber
define the authorized overlap in columns
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
what is mean by c32/40s concrete class
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)