Answer / mahendra mohan srivastava
dear friend BIS has classifide concrete in to five
condition.1- mild, 2-modrate, 3-sever, 4- very sevier and,
5-extrem condition.
In house, mild and modrate.
in mild, PCC M15 and RCC M20.
and modrate, PCC M20 and RCC M25.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / sjtbehera, harimachines
i donot understand your question. As i think the answer
your question is M20 garde of rcc we are used now a days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Sir your company in receiver ment of civil engineering.
What is Purpose Difference in Stirrups For Beam & Column ?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
what is the multiplying factor for diffrent types of pcc/rcc ratios?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
1.how to calculate 4*3 runner qty in cft. 2.how to calculate the nails qty.(column,beam,slab) 3.if any formula for binding wire qty calculation.
What is the snap size in civil and how can we create it?
what is the allowable limit of wastage of cement for RMC at plant operated manualy
what is the method of all soil testing in lab?
what is curve ranging??
I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)