please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
Answer Posted / np
in 1:6
cem .86 bag
sand .18m3
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What is factor not to be taken in consideration in mix design?
how to remove the quantity of metal 1 and metal 2 in concrete
How to check slab shuttering level.? Or check list for slab ?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
how meny typs of renging rod?
For Wet Mix Mecadam design what is Optimum moisture content
What is a tensile strength? What is the tensile strength of wood?
what is pouring and explain
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
How many square meter can a worker/labor demolish a structure per day?
why development length = 50D . why not 100D
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what is the procedure of wet seiving. n percentage of silt in different type of soil?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
how many type of admixtures for water stored structure?