please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work

Answer Posted / np

in 1:6
cem .86 bag
sand .18m3

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate load bearing column

3053


how to calculate steel for slab or footings?

1185


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1869


How to hide dimensions in autocad?

637


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1337






asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1463


how to calculate the scour depth

2347


Why are the bolts that hold steel rails together in oval holes?

699


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

978


define the strength

1700


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

1575


How to check slab shuttering level.? Or check list for slab ?

4061


How do you maintain water pressure?

652


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

1837


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2232