please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
Answer Posted / np
in 1:6
cem .86 bag
sand .18m3
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Why steel rods are produced only in even dimensions?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What is pre-stressed concrete?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
What is the average density of soil?
can you give me the details of rate analysis of steel and concrete?
why we create short columns under grade slab?
How is improve my knowledge in construction industries....
Define What is an ice dam sock?
What is the withdrawal force of steel nails?
What is the tensile strength of wood?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.